Bonaire Navigator Controller User Manual
Page 38

Multi-Appliance Navigator Control
Navigator Control
Page 38
Controls- Installation / Setup / Commissioning
Fan speed settings are correct.
Burner pressure is correct.
Mounting pad/platform complies with requirements / codes.
Internal unit access platforms & service light fitted and complies with codes.
DUAL
CYCLE
REFRIGERATED
AIR
CONDITIONING
UNIT
Unit Foundation correct and Condenser unit is level
Leak test performed
System vacuumed down
Condenser service valves opened.
System is charged with additional charge as required
All clearances around the condenser set to manufacturer’s specifications.
DUCTWORK
All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.
Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.
All roof penetrations are fully sealed and watertight.
Manhole cover replaced.
SITE
All rubbish has been removed from inside and on the roof.
CUSTOMER
HAND
OVER
The operation of the Controller.
The need to open windows and doors for the correct operation of Ducted Evaporative Air
Conditioning
The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
Evaporative cooling
Maintenance requirements