Commissioning check list, General, Ducted reverse cycle system – Bonaire Reverse Cycle User Manual

Page 34: Ductwork

Advertising
background image

Multi-Appliance Comfort Control


Page 34

Controls- Installation / Setup / Commissioning

COMMISSIONING CHECK LIST
G

ENERAL

†

All equipment ordered by the customer is installed.

†

The mains and control wiring are complete and the main switch and circuit breaker turned ON.

†

All Controller functions for the appliance operate.

†

All electrical, pipe and drain connections are to manufacturer’s specifications and the relevant local
and national codes.

†

Operate the air conditioner for heating and cooling.

D

UCTED

R

EVERSE

C

YCLE

S

YSTEM

†

Outdoor unit is installed away from flammable and corrosive materials and fumes (i.e. pool
chlorine/petrol etc).

†

The system has been leak checked and evacuated as per the installation instructions.

†

All installer settable functions have been adjusted and set correctly.

†

Indoor unit platform or suspension mounting is suitable as per the installation instructions.

†

Indoor unit is level.

†

Indoor unit drain/s have been checked and tested for flow and leaks.

†

Outdoor unit foundation / platform are suitable as per the installation instructions.

†

Outdoor unit is level.

†

All clearances around the outdoor unit are to the manufacturer’s specifications.

†

Check for abnormal noise or vibration during operation of both heating and cooling.

†

Check that the noise, condensate drainage or air flow does not disturb the neighbors.

D

UCTWORK

†

All ductwork is completed to plan, correctly supported and airtight.

†

Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.