Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 41

Advertising
background image

41

9-8 Control Module J7 Connector

J7 Connector

9.7 Complete Start Up Procedure
1.

Reset control parameters to operating settings if

adjusted to allow startup and operation test.

2.

Follow instructions TO TURN OFF GAS TO APPLIANCE

(page 42) if boiler is not being placed into

immediate operation.

3.

Enter installer information on Warranty Registration

Card.

4.

Gather all instructions, manuals, wiring diagrams,

warranty registration card and other supporting

information. Review with user and/or affix in

conspicuous location adjacent to boiler.

9 - START UP PROCEDURE

Advertising