Ch settings, Dhw sett ings – Dunkirk Helix VLT Vertical Laser Tube, Wall Hung Modulating Condensing Boiler User Manual

Page 81

Advertising
background image

81

User Interface Display

Explanation

CH Settings

Outdoor reset boost function increases CH set point by

increment (‘Temp’) if CH demand continues beyond pre-set

time limit (‘Time’).

CH set point will continue to increase until set point reaches

195°F / 91°C

Allowable Temperature Increment: 0..36 °F (0..20 °C)

Default Temperature increment: 0 °F (10 °C)

Allowable Time Delay: 1..120 minutes

Default Time Delay: 20 minutes

Maximum boiler power in CH mode limited by adjusting

‘Maximum Power CH’ setting. Boiler will not exceed this

value while operating in CH Mode.

Allowable Range: 1..100%

Default Setting: 100%

DHW Sett

ings

Two DHW modes are available

• DHW Mode = 0 ‘No DHW

• DHW Mode is disabled
• The DHW thermostat input is ignored and the DHW

pump is not used.

DHW Mode = 2 ‘DHW Store with Thermostat’

• Boiler reacts to DHW demand when DHW thermostat

input closes.

• Boiler modulates to meet DHW demand similar to CH

Mode except DHW set point is used. DHW set point set

in Settings’ submenu found in 'User Menu’.

• Simultaneous CH & DHW demands handled using DHW

Priority Timing. See ‘DHW Maximum Priority Time’

setting below.

Note:

• Outdoor reset function disabled while operating in DHW

Mode.

• Typical when using a DHW indirect storage tank.
• After DHW demand satisfied, boiler enters post purge

mode and DHW pump continues to run for 15 seconds.

APPENDIX A - CONTROL MODULE

Advertising