EXFO FTB-8100 Series Transport Blazer for FTB-500 User Manual
Page 83

Creating and Starting a Test Case
SONET/SDH Application
69
Typical Test Cases
4. Select the test
path/mapping (For DS3,
E4, E3, and E2).
4a. From the data path
selector, press the
desired mapping
then press the
timeslot from the
Grid tab. Choices
depend on the
selected interface.
See Supported
Paths/Mappings on
page 59 for more information.
4b. Select the Framing. For more
information, refer to DSn Tabs on
page 269 or PDH Tabs on page 369.
4c. For DS1, select the Enable FDL check
box to allow facility data link testing. For
Dual RX test, FDL is only available for the primary DS1 TX/RX port.
4d. For DS1/E1, select the Enable DS0/E0 check box to allow DS0 or
E0 testing.
4e. For Pattern, go to step 5.
4f. Press Next or Finish.
4g. Repeat step 4 as required to complete the path/mapping. See
Supported Paths/Mappings on page 59 for more information.
5. Pattern Configuration:
5a. Set the pattern parameters. Refer to Pattern TX
on page 405 and Pattern RX on page 409 for
more information.