9 Boiler Installation

11581

9.1 Sheet metal parts

WARNING: When installing or servicing this boiler, care should
be taken when handling the edges of sheet metal parts to avoid
the possibility of personal injury.

9.2 Installing the boiler

IMPORTANT NOTE: The system must be thoroughly flushed
using a propriety cleanser from Fernox or Sentinel to eliminate
any foreign matter and contamination e.g. metal filings, solder
particles, oil, grease etc.

Solvent products could cause damage to the system.

• Remove front panel, unscrew and remove the two retaining
screws from the bottom of the front panel. Remove front panel
by lifting up and forward.

• Remove the self adhesive wiring diagram label from the
document envelope. Fit the self adhesive wiring diagram label
to the inside of the front panel, put front panel in a safe place to
avoid damaging it.

(Horizontal Telescopic Rear Flue Only)

Fit the flue spigot and gasket , refer to diagram 9.3, supplied in
the flue pack to the rear of the appliance, having first moved and
secured the blanking plate to the top outlet.

• Ensure the plastic plugs are removed from water and gas
pipes. NOTE: There will be some spillage of water.

• Fit the cold water inlet restrictor (supplied in the document
envelope) into cold water inlet isolating valve, see diagram 7.1.

Important Note. With regards to the manual handling
operations, 1992 regulations, the following operation exceeds
the recommended weight for one man lift.

• Lift the boiler up and engage boiler onto the hanging bracket,
refer to diagram 7.1.

• Fit the boiler jig connection pipes and washers between the
boiler and isolating valves, see diagram 7.1.

DISCHARGE
SAFETY VALVE
PIPE

KNURLED
UNION NUT
finger tighten only

Diagram 9.2

10088

FILLING LOOP
EXTENSION

FILLING
DEVICE

Diagram 9.1

Diagram 9.3

SPIGOT

SECURING
SCREW (4)