Side flue rear flue, 12 horizontal top flue installation – Glow-worm 30ci Plus User Manual

Page 24

Advertising
background image

24

4000123944-2

12 Horizontal Top Flue Installation

12a.1 The Horizontal Top flue - kit 86285H

Suitable for installations that require a max. flue length "L" of
740mm.

If a shorter flue length is required, the flue can be cut to a min.
length"L" of 260mm rear or 300mm side. See diagram 12a.2 for
min. flue lengths.

12a.2 Flue systems rear and side, refer to
diagram 12a.1.

12a.3 Flue cutting, refer to diagram 12a.3.

Important: Do not leave any burrs or sharp edges on the cut
ends of the pipes.

11886a

Diagram 12a.2

70mm

65mm

450 mm

225mm

20mm
Min. Clearance

70mm

232 mm

65mm

SIDE FLUE

REAR FLUE

L

L

Note :
Top of boiler
casing not
front panel

Note :
Top of boiler
casing not
front panel

* refer to diagram 6.1

11646

B

C

J

I

H

F

G

A

D

The flue kit 86285H is 810 mm long and comprises:
- Air duct pipe .......................................................... A
- Flue duct pipe ........................................................ B
- Elbow ....................................................................... C
- Fixing collar seal .................................................... D
- Fixing collar ..............................................................E
- External rubber sealing collar ............................... F
- Internal flange ....................................................... G
- Gasket ..................................................................... H
- Screws ....................................................................... I
- 'O' rings ..................................................................... J

Diagram 12a.1

E

Horizontal Top flue kit

Advertising