0020096321_01 - 02/11 - Glow-worm

- 17 -

A - Case of a mono-zone installation :

Open the diff erent heating circuit air vent (on the pump and

the hydraulic module tank...).

1

Select Air venting on the

screen.

2

Select Vent heating circuit

on the screen.

Open the taps on the module hydraulic jig and the installation

domestic cold water inlet tap.

Fill the installation until the control unit shows 1.5 bar of

pressure.

Close the cold water inlet shutoff tap.

Vent each radiator until normal water fl ow then close the

venting valves.

Vent the hydraulic module tank.

Repeat the operation until all the radiators and the module

tank are vented.

3

Select Begin manual

venting on the screen.

The venting process is carried

out for 15 minutes. You

can simultaneously run the

venting of the HP circuit.

Check that the pressure

has not reduced (1.5

bar). If it has, repeat the

previous operations.

b

When venting is complete, close the diff erent heating

circuit air vent.

B - Case of a multi-zone installation :

The heating circuit can only be fi lled via the control unit if you

have chosen the multi-zone kit option. It is used to open the valves

of each zone.

1

Select Fill htg circuit

on the screen

The screen shows the

pressure measured in the

system.

Open the taps on the

module hydraulic jig and the

installation domestic cold

water inlet tap.

2

Select Begin fi lling

procedure from the screen.

3

The screen displays the

pressure measured in the

system and that installation

fi lling is in progress.

To stop fi lling press the button

.

Close the fi lling loop.

Vent each radiator until normal water fl ow then close the

venting valves.

Vent the hydraulic module tank.

Repeat the operation until all the radiators and the module

tank are vented.

Open the diff erent heating circuit air vent (on the pump and

the hydraulic module tank...).

3

Select Air venting on the

screen.

4

Select Vent heating circuit

on the screen.

5

Select Begin manual

venting on the screen.

The venting process is carried

out for 15 minutes. You

can simultaneously run the

venting of the HP circuit.

Check that the pressure

has not reduced (1.5

bar). If it has, repeat the

previous operations.

b

When venting is complete, close the diff erent heating

circuit air vent.