6 Installation Preparation

6.1 Appliance Pack

Please check the contents of packs as shown in diagram 6.1.

The packs are located in the top polystyrene packing.

Remove the carton sleeve and top pack then lift the boiler and

its polystyrene base support out of the lower pack.

6.2 Site Requirements

The boiler mounting wall should be suitable for the weight of the

appliance and be true and flat.

NOTE: Due to the varied site conditions we do not supply

fixings and advise that the installer should supply those which

are suitable.

6.3 Wall Template

Take the wall template from the document pack located within

the top polystyrene packing

and place in the desired position

on the wall, giving due consideration to the required boiler

clearances,

see section 3

, and the flue you are fitting.

Mark the position of the flue centre, if fitting a side flue, extend

the flue centre line into the corner then 149mm along the

adjacent wall, see diagram 6.2.

For extended side flues, the flue hole centre should be

determined by extending the dashed inclined line on the

template to the side wall. This dashed line is drawn at 44mm/

metre (2.5°) rise from the boiler. Where this line reaches the

side wall, a horizontal line should be marked. The vertical

centre line of the flue should then be marked at 176mm from

the back wall.

To allow for the flue passing through the wall at this angle a

125mm hole should be drilled irrespective of internal or external

installation.

Remove the wall template whilst drilling the flue hole.

6.4 Flue Hole Cutting

External access flue installation can use a 105mm diameter

core drill.

Internal access only flue installation will need a 125mm

diameter core drill.

NOTE: The flue is designed with an internal fall of 44mm/metre

(2.5°), therefore the hole can be drilled horizontally.
If flue extension pipes are to be used then a core drill size of

125mm is required. This will allow the extension pieces to

slope at 44mm/metre (2.5°) towards the boiler.

6.5 Wall Hanging Bracket Assembly

The Wall Hanging Bracket is supplied in the main boiler

packaging at the rear of the boiler.

Reposition the wall template over the flue hole and mark the

position of the fixing holes for the hanging bracket, see diagram

6.3.

NOTE: Due to the varied site conditions we do not supply

fixings and advise that the installer should supply those which

are suitable.

Drill fixing holes and insert suitable wall plugs.

Direct Rear Flue only - If external access is not available

the flue to be used should be assembled as described in the

separate flue instructions and inserted through the hole in the

wall before fitting the wall hanging bracket.

Fit the fixing jig support plate to the bottom of the wall hanging

bracket, push down to locate.

Mark, drill and plug at fixing points and secure the jig support

plate, see diagram 6.3.

13941

Diagram 6.2

14810

Diagram 6.3

JIG SUPPORT

PLATE FIXINGS

HANGING

BRACKET

FIXINGS

Direct Rear Flue only - The flue can now be pulled back

through the hanging bracket and secured as shown in diagram

6.3.