Maintenance, 14 condensate trap, 15 heating flow thermistor – Glow-worm Flexicom sx User Manual

Page 41: 16 heating return thermistor, 17 pump (head only)

Advertising
background image

0020107231_04 - 12/14 - Glow-worm

MAINTENANCE

- 41 -

14.14 Condensate Trap

For access, refer to section 14.1.

Remove the drain outlet pipe from the base of the trap. Remove

the condensate drain securing screw and carefully pull the trap

forward, see diagram 12.12.

On the condensate trap there is a key symbol that should be in

line with the locked padlock symbol on the condense drain. To

remove the trap turn in the direction of the unlock symbol and

carefully pull down clear of the condense drain, see diagram

12.12.

Remove any solids found in the condensate trap.

Flush water through the trap to remove any remaining solids.

Check for any debris in the outlet pipe of the condensate drain

and clean as necessary.

Reassemble and refit the condensate trap.

14.15 Heating Flow Thermistor

For access refer to section 14.1.

Remove the silencer front, fan/gas valve assembly and flue

hood for access. See relevant sections.

Refer to diagram 14.4.

Remove the electrical connections from the thermistor.

Remove the retaining clip from the flow pipe.

Remove the thermistor from the retaining clip.

Note that the polarity of the wiring to thermistors is unimportant.

14.16 Heating Return Thermistor

For access, refer to section 14.1.

Refer to diagram 14.5.

Remove the electrical connections from the thermistor.

Remove the retaining clip from the return pipe.

Remove the thermistor from the retaining clip.

Note that the polarity of the wiring to thermistor is unimportant.

14.17 Pump (head only)

For access, refer to section 14.1.

Refer to section 14.2 and drain the boiler heating circuit.

Refer to diagram 14.6.

Remove the four cap head screws.

Carefully remove the pump head together with cable. Do not

strain cable.

Support the pump head, unscrew cable cover at the side of

pump head and remove.

Disconnect wiring from pump head.

Reconnect wiring to new pump head and fit cover.

Fit the new pump head with ‘O’ ring.

Refill, vent and pressurise the boiler and check for leaks.

Diagram 14.4

13027

13060

13067

PUMP HEAD

CABLE COVER

CAP HEAD

SCREWS (4)

Diagram 14.6

Diagram 14.7

12667

Diagram 14.5

Advertising