INSTALLATION

- 20 -

15862

Diagram 7.2

7 Gas/Water Connections

7.1 System connection

NOTE: The Gas and Water systems can be connected

and filled prior to installation of boiler, refer to section 12

Commissioning. Make sure the drain points are accessible,

refer diagram 5.5.

All water and gas connections are on the fixing jig with the

exception of the condense drain and safety discharge, the

positions of these are shown on the wall template.

An Upward Piping Frame, part no. A2041500 should be used if

the supplies come from above the boiler otherwise the pipes will

have to be chased into the wall.

Assemble the pipes to the jig as shown in diagram 7.1.

Fit the Central Heating Isolation Valve handles and secure with

screws provided.

Fit the assembled Jig Plate to the Support Plate as shown in

diagram 7.2.

Assemble the Gas service isolation valve and position onto the

plastic plug.

14025

Diagram 7.1

Diagram 8.1

14812

8 Boiler Fixing

8.1 Boiler Hanging

IMPORTANT: With regards to the Manual Handling Operations,

1992 Regulations, the following lift operation exceeds the

recommended weight for a one man lift, refer to section 16

Manual Handling.

IMPORTANT: Direct Rear Flue only - The direct rear flue must

be fitted before hanging the boiler, refer to the separate flue

instructions, and the rear outlet cover plate should be removed.

The appliance and jig (pre-filled) may contain a small amount of

water, place a water container beneath the boiler connections.

Make sure the isolation valves are closed before disconnecting

the blanking plugs and discarding the jig plate.

Position the sealing washers supplied in the Loose Items pack,

as shown in diagram 6.1.

Lifting the boiler into position, lean the top of the boiler slightly to

the wall and position just above the hanging bracket. Lower the

boiler slowly, push back and engage onto the hanging bracket

making sure the boiler is located over the retaining bosses,

secure with screw provided, see diagram 8.1.

Remove the protective caps.

Engage the fixing jig connections, ensuring that the previously

positioned washers have not been disturbed.

There are flats on the body of the valves for locating a spanner

to aid tightening to copper tails using the tightening sequence

shown in diagram 8.2. Make good the final connections.

SECURING

SCREW

Plumb system pipe work to the copper tails.

Do not subject isolation valves to heat.

Prior to filling the water system ensure that the blanking plugs

and isolation valves are secured.

Flush out the domestic hot water and the heating systems.

The whole of the gas installation, including the meter, should

be inspected, tested for soundness and purged in accordance

with the current issue of BS6891 and in IE the current edition of

I.S.813 “Domestic Gas Installations”.

JIG PLATE

JIG SUPPORT

PLATE

JIG SUPPORT

PLATE

JIG PLATE

JIG PLATE

JIG SUPPORT

PLATE

JIG SUPPORT

PLATE

JIG PLATE