Hapter, Rerequisites, Support requirements – Labconco Fume Adsorbers 3955422 User Manual

Page 9

Advertising
background image

Product Service 1-800-522-7658

5










C

HAPTER

2

P

REREQUISITES

Before you install the Fume Adsorber, prepare your site for installation. A source
of electrical power should be located near the installation site to power the
enclosure. Additionally, the enclosure should be strategically placed in the lab to
provide efficient workflow.

Carefully read this chapter to learn the requirements for your installation site:

The support requirements.

The location and air current requirements.

The electrical power requirements.

The space requirements.


Refer to Appendix B: Dimensions for complete enclosure dimensions.

Refer to Appendix C: Specifications for complete enclosure electrical and
environmental conditions, specifications and requirements.

Support Requirements

At a minimum, the supporting structure usually consists of a work surface in the
laboratory. See Chapter 3 for setting up installation.

Advertising