Labconco FreeZone Triad Freeze Dry System 74000 Series User Manual

Page 11

Advertising
background image

Product Service 816-333-8811 or 1-800-522-7658

7







C

C

h

h

a

a

p

p

t

t

e

e

r

r

3

3

:

:

G

G

e

e

t

t

t

t

i

i

n

n

g

g

S

S

t

t

a

a

r

r

t

t

e

e

d

d

Now that the site for your Triad Freeze Dry System is properly prepared, you
are ready to unpack, inspect, install and test your freeze dry system.

Read this chapter to learn how to:

Unpack and move your freeze dry system.

Set up your freeze dry system.

Safely use solvents with your freeze dry system.

Unpacking Your Triad Freeze Dry System

Carefully unpack your freeze dry system and inspect it for damage that may
have occurred in transit. If your freeze dry system is damaged, notify the
delivery carrier immediately and retain the entire shipment intact for
inspection by the carrier.

The Triad Freeze Dry System weighs over 400 lbs. (181 Kg). The
carton allows for lifting with a mechanical lift truck or hand
truck. If you must lift the freeze dry system manually, use at least
four (4) persons and follow safe lifting guidelines.

If your freeze dry system was damaged in transit, you must file a
claim directly with the freight carrier. The United States
Interstate Commerce Commission rules require that claims be
filed with the delivery carrier within fifteen (15) days of delivery.
Labconco Corporation and its dealers are not responsible for
shipping damage.

Do not return goods without the prior authorization of Labconco,
unauthorized returns will not be accepted.

Do not discard the carton or packing material for your freeze dry
system until you have checked all of the components, installed and
tested the system.

Advertising