Tire pressure check, Tilt bed installation – DR Power Tow-Behind 9.00 Commercial (May 2006 - July 2010) User Manual

Page 19

Advertising
background image

CALL

TOLL-FREE

1-800-DR-OWNER 15

Tire Pressure Check

There should be 40 psi in each tire.

Tilt Bed Installation

The following procedure includes all of the steps necessary for the installation of the Tilt Bed on the DR
LEAF and LAWN VACUUM.

NOTE:

The plastic Tilt Bed is mounted loosely on the frame to allow for expansion of the plastic.

1. Place the Tilt Bed on the Trailer Frame with the mating hinges at the same end.

Tip: Block the Wheels to keep the machine from rolling away.

2. Align the left Hinge on the Tilt Bed with the left Hinge on the Trailer Frame (Figure 7).

3. Insert a Clevis Pin through the mated Hinges and secure with a Hitch Clip (Figure 7).

Tip: Tilt the Bed back for ease of inserting the Clevis Pins.

4. Repeat Step 3 for the right side Hinges.














5. Lower the Tilt Bed, using the Dump Handle, to the down position and make sure that the Dump Lever

locks into place before proceeding with the Collector Box installation (Figure 8). The Dump Lever is
spring loaded so it will click into the Locked Position when the Tilt Bed is all the way down.

Figure 7

Figure 8

Hitch Clip

Trailer Frame

Tilt Bed

Hinge

Clevis Pin

Locked Position

Dump Handle

Advertising