Unpacking the splitter and installing the wheels – DR Power Hydraulic 20-Ton User Manual

Page 14

Advertising
background image

10

DR

20-Ton WOOD SPLITTER Safety & Operating Instructions

Figure 2

Unpacking the Splitter and Installing the Wheels

The DR 20-Ton WOOD SPLITTER is shipped from the factory with the wheels
dismounted from the axles. The following instructions will detail how to unpack the
machine and assemble the wheels to the axles prior to use.

Tools & Supplies Needed:

Flat blade screwdriver

Pliers
Hammer

Knife

Gloves

Eye protection

Metal shears


Parts supplied in the plastic bag tied to the large hydraulic cylinder:

(2) Slotted Retaining Nuts

(2) Cotter Pins

(2) Hub Caps

Two wheels with inner and outer bearings are strapped to the shipping pallet and pre-
lubricated.











1. Stand to one side and cut the banding.
2. Remove the top of the carton. Separate the

stapled vertical cardboard ends from the pallet to
access the pallet straps. The staples are sharp so
be careful.

3. Pry off the fasteners and cut any ties holding the

splitter to the pallet.

4. Cut the straps holding the wheels to the pallet.
Note: The rear axle of the splitter has been raised to

allow for installation of the wheels while the
unit remains on the pallet.

5. With the valve stem facing out, slide the wheel on the axle, making certain the

inside and outside bearings remain seated in place in the wheel hub (Figure 2).

WARNING!

Always wear eye protection when cutting the banding. The

banding may have a lot of tension on it and may snap, striking you when cut.
Always stand to one side when cutting the band.

WARNING!

Always stabilize the splitter on flat terrain before

attempting to unpack and install the wheels.

Bearing

Axle

Advertising