Log cradle installation (optional), Manual log lift installation (optional) – DR Power Hydraulic 20-Ton User Manual

Page 16

Advertising
background image

12

DR

20-Ton WOOD SPLITTER Safety & Operating Instructions

Figure 5

Log Cradle Installation (Optional)

The following procedure includes all of the steps necessary for the installation of the
optional Log Cradle on the DR 20-Ton WOOD SPLITTER.





Tool Needed:

9/16" wrench or socket


1. Mount the Log Cradle on the

operators side of the wood
splitter (Figure 5) and the Log
Cradle retaining panel on the
opposite side of the H-beam
using the three 3/8" bolts and
nuts. Tighten the bolts using the
9/16" socket.

Manual Log Lift Installation (Optional)

The following procedure includes all of the steps necessary for the installation of the
optional lever-action Manual Log Lift (Figure 6) on the DR 20-Ton WOOD SPLITTER.

Tools Needed:

1/2" wrench or

socket

9/16" wrench or

socket

1. If the optional Log

Cradle is employed,
remove the three
bolts that hold it on
(Figure 5).

2. Replace the Log

Cradle retaining
panel with the Log
Lift mounting plate,
then re-insert and
tighten the three
bolts and nuts. See
Figure 7 on page 13.

WARNING! Before performing any maintenance procedure, stop the

engine and disconnect the spark plug wire.

Log Cradle (2 shown)

3 Bolts

Figure 6

Advertising