Flowserve VCT User Manual

Page 12

Advertising
background image

USER INSTRUCTIONS APM, APMA and APH MX0301 - 07/03

Page 12 of 32

®

procedure for shutting down the machine is
followed, as described in section 5.8.

On completion of work all guards and safety
devices must be re-installed and made operative
again.

Before restarting the machine, the relevant
instructions listed in section 5, Commissioning,
start up, operation and shut down
must be
observed.

Oil and grease leaks may make the ground
slippery. Machine maintenance must always
begin and finish by cleaning the ground and the
exterior of the machine.

If platforms, stairs and guard rails are required for
maintenance, they must be placed for easy access
to areas where maintenance and inspection are to
be carried out. The positioning of these
accessories must not limit access or hinder the
lifting of the part to be serviced.

When air or compressed inert gas is used in the
maintenance process, the operator and anyone in
the vicinity must be careful and have the
appropriate protection.

Do not spray air or compressed inert gas on skin.

Do not direct an air or gas jet towards other people.

Never use air or compressed inert gas to clean
clothes.

Before working on the pump, take measures to
prevent an uncontrolled start. Put a warning board
on the starting device with the words: "Machine
under repair: do not start"
.

With electric drive equipment, lock the main switch
open and withdraw any fuses. Put a warning board
on the fuse box or main switch with the words:
"Machine under repair: do not connect".

Never clean equipment with inflammable solvents
or carbon tetrachloride. Protect yourself against
toxic fumes when using cleaning agents.

6.2 Maintenance schedule

It is recommended that a maintenance plan

and schedule is adopted, in line with these User
Instructions, to include the following:
a) Any auxiliary systems installed must be

monitored, if necessary, to ensure they function
correctly.

b) Gland packings must be adjusted correctly to

give visible leakage and concentric alignment

of the gland follower to prevent excessive
temperature of the packing or follower.

c) Check for any leaks from gaskets and

packings. The correct functioning of the shaft
seal must be checked regularly.

d) Check that the duty condition (capacity, head,

voltaje, current, etc. ) is in the design operating
range for the pump and record them.

e) Check

vibration

to

confirm

satisfactory

operation.

f) Check dirt and dust is removed from areas

around pump and motor.

g) Check coupling alignment and re-align if

necessary.


Our specialist service personnel can help with
preventative maintenance records and provide
condition monitoring for vibration to identify the
onset of potential problems.

If any problem are found the following sequence of
actions should take place:
a) Refer to section 7, Faults; causes and

remedies, for fault diagnosis.

b) Ensure

equipment

complies

with

the

recommendations in this manual.

c) Contact Flowserve if the problem persists.

6.2.1 Routine inspection (daily/weekly)

The following checks should be

made and the appropriate action taken to remedy
any deviations:
a) Check operating behaviour. Ensure vibration is

normal.

b) Check that there are no abnormal fluid or

lubricant leaks (static and dynamic gasket or
packing ) and that any sealant systems (if
fitted) are full and operating normally.

c) Check that shaft seal leaks are within

acceptable limits.

d) Check the level and condition of motor

lubricant. Check running hours since last
recharge or complete lubricant change.

e) Check any auxiliary supplies (if fitted) are

functioning correctly.

Refer to the manuals of any associated

equipment for routine checks needed.

6.2.2 Periodic inspection (six monthly)

a)

Check foundation bolts for

security of attachment and corrosion.

b) Check pump running records for hourly usage

to determine if there is some operating change.

c) The coupling should be checked for correct

alignment (If necessary ).