Flowserve VCT User Manual

Page 6

Advertising
background image

USER INSTRUCTIONS APM, APMA and APH MX0301 - 07/03

Page 6 of 32

®

2.1 Consignment receipt and
unpacking

Immediately after receipt of the equipment it must
be

checked

against

the

delivery/shipping

documents for its completeness and that there has
been no damage in transportation. Any shortage
and/or damage must be reported immediately to
Flowserve Pump Division and must be received in
writing within one month of receipt of the
equipment. Later claims cannot be accepted.

Check any crate, boxes or wrappings for any
accessories or spare parts that may be packed
separately with the equipment or attached to side
walls of the box or equipment.

Each product has a unique serial number. Check
that this number corresponds with that advised and
always quote this number in correspondence as
well as when ordering spare parts or further
accessories. For Flowserve contact see point 11.4

2.2 Handling

Boxes, crates, pallets or cartons may be unloaded
using fork-lift vehicles or slings dependent on their
size and construction.

2.3 Lifting

To avoid distortion, the pump unit

should be lifted as shown. All lifting should be done
using the lifting points that have been provided.
(See the outline drawing for location, size
configuration and for total equipment weight.)
Arrange any slings, chains or cables so that the
weight is distributed uniformly. Use spread bars
when necessary to avoid undue pressure on light
sheet metal parts.
If lifting lugs are provided on discharge head
baseplate lift it as shown.

If lifting lugs are provided in the top of discharge
head , lift it as follow.

For installing pump handle the pump as follow:



Advertising