Commissioning

– contin ued –

Check sw itching functions

- co ntinu ed -

Electrode rod 3 = timed pum p control (fill control)

Electrode rod 3 emerges

Relay3 is energized, pump ON

LED 3
illuminated

Electrode rod 3 enters the
liquid

Relay3 is de-energized after a preset time delay
(0 – 30 sec.) = pump OFF

LED 3 off

Relay 3 is de-energized too early or too late: Increase or decrease time delay with the aid of the

potentiometer and let electrode tip 3 emerge or enter the liquid again. Repeat the process until

you have found the correct switchpoint for the pump. If 30sec. time delay is not enough for filling

the boiler, please select the operation mode "on-off pump control".

Electrode rod 3 = on-off pump control (fill control)

Set potentiometer for time delay to 0 sec.

Electrode rods2 and 3
exposed

Relay3 is energized, pump ON

LEDs2 and 3
illuminated

Electrode rod 2 enters the
liquid

LED 2 off

Electrode rod 3 enters the
liquid

Relay3 is de-energized = pump OFF

LED 3 off

Electrode rods 2 and 3 = on-off pump control (discharge control)

Set potentiometer for time delay to 0 sec.

Electrode rods2 and 3
submerged

Relay3 is energized, pump ON

LED 2 off and
LED 3
illuminated

Electrode rod 3 emerges

LED 3 off

Electrode rod 2 emerges

Relay3 is de-energized = pump OFF

LED 2
illuminated