Flowserve PT Series Limitorque User Manual

Page 37

Advertising
background image

37

Limitorque PT Series Worm Gear Operator FCD LMENIM2001-00 – 01/10

flowserve.com

4.10 Spur Gear Attachments - PT65, 120, 150

Refer to Figure 4.18, 4.19, 4.20 and Table 4.8

1. Remove the Socket Head Cap Screws (pc# 9) that secure the Spur Gear Attachment (SGA) Cover (pc# 2) to the

SGA Housing (pc# 1)

2. Remove the SGA Cover, Input Pinion (pc# 3) and SGA Cover Gasket

3. Remove the Intermediate Gear (pc# 4)

4. Remove the Output Gear (pc# 5) from the Worm Shaft

5. Remove the SGA Housing (pc# 1) and SGA Housing Gasket (pc# 13)

6. If the PT requires disassembly, please see section 4.5

Reassembly Instructions:

1. Install the SGA Housing (pc# 1) and SGA Housing Gasket (pc# 13)

2. Insert the Output Gear (pc# 5) onto the PT Worm Shaft

3. Install the Intermediate Gear (pc# 4)

4. Re-lubricate thoroughly the Oil Seal (pc# 10) in the SGA Cover (pc# 2)

5. Re-lubricate the SGA Housing to replace lubricant lost during disassembly

6. Install the SGA Housing Cover (pc# 2) with Input Pinion (pc# 3) and SGA Cover Gasket.

note: Replace any worn or damaged O-rings or gaskets to ensure proper sealing.

Figure 4.18 – PT65, 120, 150 SGA Disassembly & Reassembly

9

12

3

Advertising