Commissioning procedure – Flowserve OR 52-7 User Manual

Page 17

Advertising
background image

7

Commissioning Procedure

Factory setting

The measuring transducer features the following factory set default values:

Limit alarm : 5 ppm

Limit alarm 2: 5 ppm

Delay of response alarm :  second

Delay of response alarm 2:  seconds

Warning

The terminal strips of the measuring transducer ORT 7 may be live during operation!
This presents the risk of severe injuries due to electric shock!
Cut off power supply before opening the housing lid!

Checking electrical connection

Before commissioning the equipment:

Check the connection of the supply voltage

The supply voltage is indicated on the name plate

Make sure that the connections of the signal inputs and alarm contacts are in accordance with the

wiring diagram.

Checking installation

Check all pipe connections for leaks and eliminate any leaks you encounter.

Unscrew the drying cartridge and remove the seal. Then screw the cartridge in again.

Advertising