Commissioning Procedure

– continued –

First commissioning

. Apply supply voltage to the measuring transducer.

The green LED ON will be illuminated and alarm 2 is

signaled.

2. When the equipment is switched on, the system window

appears for approx. 3 seconds, indicating the following:

Name of the equipment,

Certificate,

Serial number,

Number of the software version.

3. After approx 3 seconds the measurement window

appears, indicating the following:

Oil content (in large characters),

State: Warm up

Current time / date in UTC

4. After approx. 30 seconds the actual value in ppm is

indicated in the measurement window. If this value is

below 5 ppm the message Alarm 2 is cancelled and the

equipment state “Ready” is indicated. If, however, the

value continues to exceed 5 ppm, the message Alarm 2

remains active and the equipment state “ppm>Limit” is

indicated.

5. Press now key

+. The purging valve opens and Alarm 2 is

indicated. The equipment state “Clear Water ON” appears.

Rinse the measuring transducer ORG 2 for at least

5 minutes with oil-free water and operate the cleaning

device

4 2 – 3 times, Fig. 5. During the rinsing process

with oil-free water the measuring window should show

0 ppm. If this is not the case switch to programming

mode, Parameter Value Offset, and reduce the zero point

by a max. of 5 ppm.

6. To close the purging valve press key

. The equipment

state “Ready” or “ppm>Limit” or any other alarm message

is indicated.

Note that in the measurement window the keys  and  and “OK” do not have a function. If you

want to enter the programming mode press key

P.

Device
Certif.

Ser.Nr.

Vers.

: ORT7
: IMO

: MEPC.107(49)
: 392358

: 311137.10

Flowserve Gestra

OIL CONTENT :

ppm

State: WarmUp

8

UTC 10:46

2006-12-06

OIL CONTENT :

ppm

State: ready

8

UTC 10:46

2006-12-06

OIL CONTENT :

ppm

State: ClearWater ON

0