Fronius String Control 250/25 DCD DF User Manual

Page 70

Advertising
background image

12

1

1

1

1

1

OFF

ON

-

Insert metric screw joints corresponding to the number of available
solar module strings, insert threaded plugs in the empty positions.

-

Follow a specific sequence when inserting the metric screw joints:
from bottom to top and from outside to inside.

-

Use the specified tightening torque corresponding to their size for the
metric screw joints and threaded plugs.

Installing Metric Screw Joints on the Fronius
String Control 250/25 DCD DF

31

35

32

33

34

54

26

25

1

2

3

4

27

5

6

28

29

30

M16

M32/M40 M32/M40

M16

M25

M20*

* only for optional overvoltage protection as outlet for the ground cable

Preparation

General

Recommen-
ded Sequence
for Inserting
the Metric
Screw Joints

Advertising