FSR T3-AC2CP User Manual

T3-ac2cp installation instructions

Advertising
background image

FSR

244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207

43169

LIT1285A

1.63

3.25

1.63

3.25

5.50

ASSEMBLED VIEW

UNDERSIDE VIEW OF SHROUD

#6 / #8 MOUNTING
SCREW HOLES

3.50" DIA. THRU
HOLE ON TABLE

PRE-CUT 3.50" DIA.

HOLE IN TABLE

1.00" MIN. TO 2-1/2" MAX.
TABLE THICKNESS

(6) #6 / #8 x 1/2"

WOOD SCREW

(5) CABLE
TIE TAB

T3-AC2CP
SUB-ASS'Y

DROP THE 'T3-AC2CP' SUB-ASS'Y
INTO THE HOLE IN THE TABLE
(COVER ORIENTATION IS PRE-SET
BY THE SHROUD INSTALLATION).

INSTALL CLAMP SHROUD TO UNDERSIDE
OF TABLE HOLE WITH (6) WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED
COVER SWING DIRECTION.

PASS THE DESIRED-LENGTH (2) LONG
THREADED ROD THRU THE SHROUD AND
THREAD INTO SHORT STANDOFFS IN THE
SUB-ASS'Y. TURN THE LOCKING NYLON NUT
UP SNUG AGAINST THE SHROUD BASEPLATE
TO PULL THE SUB-ASS'Y DOWN COMPLETELY
INTO PLACE IN THE PRE-CUT 3.50" DIA. HOLE.

MAKE ELECTRICAL CONNECTIONS AS
REQUIRED AND TIE-WRAP CABLES TO
TIE-TABS. ENSURE CONNECTORS IN THE
SUB-ASS'Y CAN BE PULLED OUT 3'-0"
PRIOR TO SECURING CABLES TO TIE TABS.

T3-AC2CP

INSTALLATION

INSTRUCTIONS

1

2

4

4.25

2.13

7.50

2.13

(2) LOCKING NYLON NUT

(2) #6-32 x 2.00" or 3.00" LONG

THREADED ROD

3

Advertising
This manual is related to the following products: