FSR T3-DV2S User Manual

FSR Equipment

Advertising
background image

FSR

244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207

43072

LIT1519B

T3-DV2S / T3-PC1D INSTALLATION INSTRUCTIONS

INSTALL SHROUD TO UNDERSIDE OF TABLE HOLE WITH WOOD SCREWS
AS SHOWN. ORIENT PER DESIRED COVER SWING DIRECTION.

1.

2. MAKE ELECTRICAL CONNECTIONS AS REQUIRED AND ENSURE

WIRES PASS THRU PROPER OPENINGS IN THE SHROUD. DROP THE
T3 ASSEMBLY INTO THE HOLE (COVER ORIENTATION IS PRE-SET BY
SHROUD INSTALLATION).

3. PASS THE DESIRED-LENGTH (2) LONG THREADED ROD THRU SHROUD

AND THREAD INTO T3 ASSEMBLY. TURN THE LOCKING NYLON NUT UP
SNUG AGAINST THE SHROUD BASEPLATE TO PULL THE T3 ASSEMBLY
DOWN COMPLETELY INTO PLACE IN THE TABLE HOLE.

TIE WRAP CABLES TO THE TAB(S) PROVIDED ON SHROUD.

4.

3.50" DIA

THRU TABLE

T3 ASSEMBLY

PRE-CUT
3.50" DIA
HOLE IN
TABLE

ASSEMBLED VIEW

UNDERSIDE VIEW OF SHROUD

1.00" MIN TO

2-1/2" MAX

TABLE

THICKNESS

(3/4" MIN FOR

NO-BUTTON

MODEL)

MODEL ILLUSTRATED

MAY DIFFER FROM

MODEL PURCHASED

#6 / #8 MOUNTING HOLES
TRANSFER HOLES FROM
SHROUD TO TABLE

CABLE TIE TAB

SHROUD

MODEL ILLUSTRATED

MAY DIFFER FROM

MODEL PURCHASED

#6 / #8 x 1/2"

WOOD SCREW

(2) LOCKING NYLON NUT

(2) #6-32 x 2.00" or 3.00" LONG

THREADED ROD

Advertising
This manual is related to the following products: