Tools & materials required – Greenheck Melink IH3 Installation User Manual

Page 3

Advertising
background image

Melink Corporation (513) 965-7300 www.melinkcorp.com

Tools & Materials Required

Materials Required

Suitable fasteners for mounting the System Controller and Variable Frequency Drive
(VFD)

▫ hollow cinder block (3/16” toggle bolts)

▫ concrete or filled cinder block (lead anchors 1/2” dia. with 1/4” x 1-14” lag screws)

▫ drywall (3/16” toggle bolts)

▫ plywood (#8 X 1-1/4” wood screws)

▫ metal back-plate (#8 X 1-1/4” sheet metal screws)

Conduit and wire for wiring the System Controller and VFDs

Tools Required

Drill and Drill Bits (Cobalt is best for stainless steel) - bit sizes: 1/8” & 1/4”

Hole Cutter or Punch for Stainless Steel with cutter sizes: 1-1/2” & 1-1/8”

Adjustable Pliers and Adjustable Wrench

Screwdrivers - Straight & Phillips, Large and Small

Wire Cutter and Wire Stripper

Measuring Tape and Level

Step Ladder

Note:

All high voltage wiring to be completed by trained service personnel. (Local code

may require a licensed electrician.)