Installation evaporative cooler piping (optional), Install the water supply line, Install the drain line – Greenheck DG/DGX Pilot Ignition (470651_IOM) User Manual

Page 9: Check/adjust water level, Test the system for leaks, Pipe the optional vent line, Evaporative cooling with recirculating pump

Advertising
background image

Optional Vent Line

WARNING

NEVER test for a gas leak with an open flame.

NOTE

The factory piping has been checked for leaks,
but should be rechecked due to shipping and
installation.

WARNING

Reference the National Fuel Gas Code for additional
vent line requirements.

Installation Evaporative Cooler

Piping (optional)

IMPORTANT

All supply solenoids, valves and all traps must be below

the roof line or be otherwise protected from freezing.

IMPORTANT

The supply line should be of adequate size and

pressure to resupply the amount of water lost due to

bleed-off and evaporation. The drain line should be

the same size or larger than the supply line.

CAUTION

Provisions must be taken to prevent damage to the

evaporative cooling section during freezing conditions.

The sump, drain lines and supply lines must be

drained prior to freezing conditions or an alternate

method must be used to protect the lines and media.

Evaporative Cooling with Recirculating Pump

1. Install the Water Supply Line

Supply line opening requirements vary by unit size and
arrangement and are field-supplied. Connect the water
supply line to the float valve through the supply line
opening in the evaporative cooling unit. Install a manual
shutoff valve in the supply line as shown above.

2. Install the Drain Line

Connect an unobstructed drain line to the drain and
overflow connections on the evaporative cooler.
A shut off valve (by others) is required for the
evaporative cooler drain line.
A trap should be
used to prevent
sewer gas from being
drawn into the unit.
Refer to drain trap
diagram.

3. Check/Adjust Water Level

Check the water level in the sump tank. The water
level should be above the pump intake and below the
overflow. Adjust the float as needed to achieve the
proper water level.

Recirculating Evaporative Piping

6 in. min.

6 in. min.

Drain

Trap

5. Test the System for Leaks

Check both the supply lines and the factory piping
for leaks. Apply a soap and water solution or other
approved leak test solution to all piping and watch for
bubbling which indicates a leak.

4. Pipe the Optional Vent Line

If an optional vent line is located between the safety
shutoff valves, it must be piped to the outdoors.

Vent Line Solenoid

Safety Shut-Off Valves

to burner

to outdoors

from supply

Vent Line

Supply Line

Overflow

Trap

Drain Line

Supply Line Valve

(normally closed)

Drain Line Valve

(normally open)

Model DG / DGX Pilot Ignition Make-Up Air

9

®