Layout of cutting machine and hd3070 system – Hypertherm HD3070 w/Manual Gas User Manual
Page 15

2-4
HD3070 with Manual Gas Console
Product Configuration Manual
4
ORDERING PROCEDURE
Layout of Cutting Machine and HD3070 System
When configuring an HD3070 system(s), it is important to know where each major component will be placed. This
will vary with the cutting machine manufacturer and with the particular installation. After the location of the major
components has been determined, the interconnecting leads and cable lengths can be specified.
It is critical to follow the path that the interconnecting leads will follow and allow for some slack when specifying
their lengths. Do not try to get by with the next shorter length!
Pictured below is a diagram showing an overhead view of a typical precision cutting X-Y machine. Installations
vary, so use this figure as a guide.
Rail
Water
Table
Torch
Rail
Bridge
* Cables are usually in a power track or festoon
system. Cable, lead and hose lengths must allow
for routing through the system.
Figure 2-1
Gantry (Bridge) Layout*