Installation – Desa CGS2718NA User Manual

Page 16

Advertising
background image

www.desatech.com

113101-01C

16

Pressure Testing Heater Gas
Connections
1. Open equipment shutoff valve (see Figure 15,

page 15).

2. Open main gas valve located on or near gas

meter for natural gas or open propane/LP

supply tank valve.

3. Make sure control knob of heater is in the

OFF position.

4. Check all joints from gas meter (natural gas)

or propane/LP supply to equipment shutoff

valve (see Figure 16 or 17, page 15). Apply

a commercial leak detection solution to all

joints. Bubbles forming show a leak.

5. Correct all leaks at once.
6. Light heater (see Operating Heater, page 18

[manually-controlled models] or page 21

[thermostatically-controlled models]). Check

all other internal joints for leaks.

7. Turn off heater (see To Turn Off Gas to Appli-

ance, page 20 [manually-controlled models] or

page 22 [thermostatically-controlled models]).

INSTALLING LOGS, MODELS
CGS2718PA, CGS2718NA,
CGS3124PA, CGS3124NA,
SGS3124PA AND SGS3124NA

WARNING: Failure to position

the parts in accordance with these

diagrams or failure to use only

parts specifically approved with

this heater may result in property

damage or personal injury.

CAUTION: After installa-

tion and periodically thereafter,

check to ensure that no flame

comes in contact with any log.

With the heater set to High, check

to see if flames contact any log. If

so, reposition logs according to

the log installation instructions

in this manual. Flames contact-

ing logs will create soot.

INSTALLATION

Continued

Each log is marked with a number. These numbers

will help you identify the log when installing. It

is very important to install these logs exactly as

instructed. Do not modify logs. Only use logs

supplied with heater.
1. Locate pegs on the bottom of back log (#1).

Slide these pegs into the holes in the grate base

behind the burner (see Figure 18).

2. Locate the notches on the back of the front log

(#2). Slide these notches over the tabs of the

grate base (see Figure 19).

3. Locate the holes in the bottom of the left

crossover log (#3). Place crossover log on

pegs on left of the back log and front log (see

Figure 20, page 17).

4. Locate the holes in the bottom of the right

crossover log (#4). Place crossover log on

pegs on right of the back log and front log

(see Figure 20, page 17).

5. Add lava rock around base of heater if desired.

Do not place lava rock on logs or burner.

Figure 18 - Installing Back Log

Back Log (#1)

Hole

Figure 19 - Installing Front Log

Front
Log (#2)

Notch

Tabs of
Grate Base

Advertising