4 operation, 1 important notes on operation, Important notes on operation – Nortec ME Direct Feed User Manual

Page 18: 4operation

Advertising
background image

18 Operation

4

Operation

4.1

Important notes on operation

Qualification of personnel

The Nortec ME Direct Feed must be commissioned and op erated only by personnel familiar with the

system and adequately qualified for the respective tasks. It is the owner’s responsibility to verify proper

qualification of the operating personnel.

General notes
The instructions and details regarding commissioning and operation must be followed and upheld.
The initial commissioning of the Nortec ME Direct Feed requires appropriately trained technical person-

nel. It is strongly recommended that

your Nortec representative

commissions your system. Part of this

initial commissioning process may include a disinfection of the water tank and the evaporative cassettes.

Please read this document in full before commencing any work.
Please pay attention to local regulations regarding working at heights and electrical work.

Safety and hygiene

DANGER!

The Nortec ME Direct Feed must be operated in accordance with this manual. Failure to do so

could result in contamination that might cause Legionnaires’ disease, which can be fatal

WARNING!

The Nortec ME Direct Feed system equipped with an optional Nortec ME Direct Feed control

unit should not be electrically isolated for periods exceeding 24 hours as automatic drain and

purge cycles will be disabled.

Advertising