Nortec Air Humidification System BS User Manual

Page 19

Advertising
background image

25.05.05-A

page 19 of 30

5.2

General notes on placing

The place of installation of a system is always determined during planning and noted in the system
documents. The following general planning notes, however, have to be read and complied with in
any case:

-

Make sure that the construction (wall, pillar, ceiling construction, etc.) on which the devices

and/or system components will be mounted disposes of a sufficient load-carrying capacity

and is suitable for fixing (see Chapter 8. “Technical data“).

-

Place the atomisers in such a way so as to enable the aerosol mist to spread freely. When the

aerosol mist is prevented from that by obstacles (e.g. ceilings, beams, etc.), build-up and

turbulences that may result in condensation occur.

-

In the following illustration, you will find the measurements for the expansion of the aerosol

stream and the minimum distances that have to be kept. The measurements relate to the

maximum humidification capacity of the atomiser nozzles and a room temperature between

18° and 24°C (64 and 75°F). When the temperature is higher, the expansion of the aerosol stream is

reduced, when the temperature is lower, it increases.

-

When atomiser nozzles are installed one opposite the other, make sure that the distance of at least

8 m (26 ft) is maintained between the nozzles in order to avoid that the aerosol streams

condensate each.

-

Pay attention to the current of the room air. Do not install atomiser nozzles in the immediate

vicinity of an exhaust system or of a cold-air inlet.

-

Do not direct atomiser nozzles at cold parts of a building, e.g. outside walls, windows, etc. (risk of

condensation).

-

Insulate cold-water pipes in the area of the aerosol stream (risk of condensation).

-

The evaporation process absorbs heat from the ambient air. For this reason, make sure that the

aerosol stream is not directed on persons or on places directly above workplaces.

-

In order to guarantee an optimum humidification, ensure that the atomisers are sensibly

distributed in the room.

-

The system components have to be mounted in such a way so as to provide for enough space

for operation and maintenance.

-

Please contact NORTEC in case you have questions on the placement.

Advertising