5.3

General notes on assembly

-

Installation has to be carried out according to the general engineering rules and the connection
regulations of the local utility companies.

-

Before the installation, check whether the delivery is complete and undamaged, using the delivery
note for this purpose.

-

The tubes may only be installed by certified master craftsmen that were instructed on how to
proceed.

-

No unauthorised conversions or alterations may be carried out on the devices.

-

No additional fittings (e.g. valves, etc.) that are not included in the assembly plan may be installed
in the NORTEC system.

-

These assembly instructions only refer to individual systems. The manufacturer provides
individual system diagrams for the customers' systems.

-

Furthermore instruction measures on assembly are carried out. The assembly instructions, the
diagrams and the instruction are binding for the execution.

-

It is obligatory to comply with the material specifications.

5.3.1 Atomiser

BS5/10


Positioning of the atomisers

-

Select a distance to the ceiling of at least 0.5m (1.64 ft)

-

Do not place the atomisers directly above a workplace


Min. 0,5m (1.64 ft)

-

The air space has to be free over a distance of 3-4m
(9.84-13 ft) in an angle of 90°.

-

Avoid exposure of the atomisers to direct sunlight.




Min. 2,5 m (8.2 ft)