Plastic vacuum air tube, Control box, 2) removing main burner and gas valve – Space Ray LTU Series Two Stage User Manual

Page 35: 3) air switch pressure check

Advertising
background image

Form #42710010
May 2013

-33-

21.2) REMOVING MAIN BURNER AND GAS VALVE

The main burner can be inspected without removing the burner housing from the heat exchanger tube.

2

1

3

4

5

6

1. Disconnect electrical supply and gas connection at the restrainer nipple.

2. Open the access panel and disconnect the wires from gas valve.

3. Remove the burner clamp and screws.

4. Remove the burner and gas valve assembly from the cabinet.

5. Unscrew the burner from the manifold.

6. Check the orifice. If the gas valve is to be replaced, the pipe joint compounds must be resistant to the action

of liquefied petroleum gases.

21.3) AIR SWITCH PRESSURE CHECK

Plastic Vacuum

Air Tube

0.16” WC

+

-

Connector

Tee

Digital or Inclined

Water Manometer

scale 0-2”w.c.

Temporary 1/4” ID Silicone /

plastic tubing for pressure

test.

Control Box

Air sensing

tube bracket


1. Open hinged access panel.

2. Add tubing to connect the air switch with the connector tee and the existing tubing.

3. Connect plastic tubing of a digital or inclined water manometer with a 0-2” scale onto the connector tees.

4. Turn heater on and wait until blower motor is activated.

5. Observe air pressure from manometer. This should be higher than the set point 0.16” w.c. for correct

operation.

All pressures are with the heater i

All pressures are with the heater i

All pressures are with the heater i

All pressures are with the heater in operation for at least 15 minutes.

n operation for at least 15 minutes.

n operation for at least 15 minutes.

n operation for at least 15 minutes.

Advertising
This manual is related to the following products: