Continued

CAUTION: Do not pick up

heater assembly by logs. This

could damage unit. Only handle

assembly by grates.

IMPORTANT:

Make sure the heater burners are

level. If heater is not level, heater will not work

properly.
Installation Items Needed

• control cover kit (provided with heater)

• approved flexible gas hose and fittings (pro-

vided with heater) (if allowed by local codes)

• sealant (resistant to propane/LP gas, not

provided)

Note:

Install optional HRC100 and HRC200

Receiver and Hand-Held Remote Control Kit

(see Accessories, page 26) before installing gas

log heater. See installation instructions included

with the kit.

1. Apply pipe joint sealant lightly to male

threads of gas fitting (not provided). Connect

approved flexible gas hose to inlet side of gas

control (see Figure 12).

2. Position heater assembly in fireplace.

3. Connect to gas supply. See Connecting To

Gas Supply.

Figure 12 - Attaching Flexible Gas Hose

to Heater Gas Regulator

Gas Control Valve

Flexible Gas Hose
(if allowed by local
codes)

CONNECTING TO GAS SUPPLY

WARNING: This appliance

requires a 3/8" NPT (National

Pipe Thread) inlet connection to

the pressure regulator.

WARNING: A qualified service

person must connect heater to gas

supply. Follow all local codes.

Propane/LP
Supply Tank

External
Regulator

Figure 13 - External Regulator With Vent

Pointing Down

Vent
Pointing
Down

CAUTION: Never connect

propane/LP fireplace directly

to the propane/LP supply. This

heater requires an external regu-

lator (not supplied). Install the

external regulator between the

heater and propane/LP supply.

WARNING: Never connect

natural gas fireplace to private

(non-utility) gas wells. This

gas is commonly known as

wellhead gas.

Installation Items Needed

Before installing heater, make sure you have the

items listed below.

• external regulator (supplied by installer)

• piping (check local codes)

• sealant (resistant to propane/LP gas)

• equipment shutoff valve *

• test gauge connection *

• sediment trap

• tee joint

• pipe wrench

• approved flexible gas line with gas connector

(if allowed by local codes) (provided)

* A CSA design-certified equipment shutoff valve

with 1/8" NPT tap is an acceptable alternative to

test gauge connection. Purchase the optional CSA

design-certified equipment shutoff valve from your

dealer. See Accessories, page 26.

For propane/LP units, the installer must supply an

external regulator. The external regulator will reduce

incoming gas pressure. You must reduce incoming

gas pressure to between 11" and 14" of water. If you

do not reduce incoming gas pressure, heater regulator

damage could occur. Install external regulator with the

vent pointing down as shown in Figure 13. Pointing

the vent down protects it from freezing rain or sleet.