PIPING SYSTEM
Test Pressures In Excess Of 1/2 PSIG
(3.5 kPa)

1. Disconnect appliance with its appliance main

gas valve (control valve) and equipment

shutoff valve from gas supply piping system.

Pressures in excess of 1/2 psig will damage

heater regulator.

2. Cap off open end of gas pipe where equipment

shutoff valve was connected.

3. Pressurize supply piping system by either

opening propane/LP supply tank valve for

propane/LP gas or opening main gas valve

located on or near gas meter for natural gas

or using compressed air.

4. Check all joints of gas supply piping system.

Apply noncorrosive leak detection fluid to all

joints. Bubbles forming show a leak.

5. Correct all leaks at once.

6. Reconnect heater and equipment shutoff

valve to gas supply. Check reconnected fit-

tings for leaks.

Test Pressures Equal To or Less Than
1/2 PSIG (3.5 kPa)

1. Close equipment shutoff valve (see Figure 15).

2. Pressurize supply piping system by either

opening propane/LP supply tank valve for

propane/LP gas or opening main gas valve

located on or near gas meter for natural gas

or using compressed air.

3. Check all joints from gas meter to equipment

shutoff valve for natural gas or propane/LP sup-

ply to equipment shutoff valve for propane/LP

(see Figure 16 or 17). Apply noncorrosive leak

detection fluid to all joints. Bubbles forming

show a leak.

4. Correct all leaks at once.

INSTALLATION

Continued

Figure 15 - Equipment Shutoff Valve

Figure 17 - Checking Gas Joints

(Natural Gas Only)

Control Valve
Location

Equipment
Shutoff Valve

Propane/LP
Supply Tank

Equipment
Shutoff Valve

Gas Meter

Figure 16 - Checking Gas Joints

(Propane/LP Gas Only)

Control Valve
Location

PRESSURE TESTING HEATER GAS
CONNECTIONS

1. Open equipment shutoff valve (see Figure 15).

2. Open main gas valve located on or near gas

meter for natural gas or open propane/LP

supply tank valve.

3. Make sure control knob of heater is in the OFF

position.

4. Check all joints from equipment shutoff valve

to gas control (see Figures 16 and 17). Apply

noncorrosive leak detection fluid to all joints.

Bubbles forming show a leak.

5. Correct all leaks at once.

6. Light heater (see Operating Heater, page 16).

Check all other internal joints for leaks.

7. Turn off heater.

Equipment
Shutoff
Valve

Open

Closed