Conversion kit instructions cont, Dvie33 – Archgard 31-DVIE33N User Manual

Page 14

Advertising
background image

31-DVIE33

14

CONVERT THE GAS VALVE















CONVERSION KIT INSTRUCTIONS CONT.

COMPLETE THE CONVERSION


Turn on the gas and electrical supplies.

Turn on the fireplace so the burner is on

Check for leaks at all connections.

Test inlet and outlet pressure. Visually check pilot flame. Flame should envelope top of the flame sensor and extend

forward onto the burner. To adjust pilot turn the pilot adjustment screw on the control valve clockwise to

decrease or counter clockwise to increase pilot flame.


Turn fireplace off

Affix gas type label to the rating plate label. (Bottom right side, under the door frame of insert on pull chain)

Complete the conversion label and affix to valve assembly plate.

Re-install the burner, brick, logs, embers and door.

(per the instructions starting on pg. 19)

Advertising
This manual is related to the following products: