SMA SB 4200TL HC Multi-String User Manual
Page 58
Advertising
![background image](/files/818901/content/doc058.png)
The Communications Interface
SMA
Technologie AG
Page 58
SBTLHCMS-IEN080411
Installation Guide
3.
Plug the NLM Piggy-Back into the board (F). Do not mount any jumpers.
4.
Place the included support (G) of the PLC power module in the socket as seen in
the figure (the rightmost). It must snap into place.
5.
Then place the PLC power module (H) in the socket as seen in the figure. The PLC
power module must snap into place.
6.
Place the plug connector in the free socket of the PLC power module.
7.
Close the Sunny Boy as described in section 7. 2.
F
Interface port
G
Support
H
PLC power module
F
G
H
Advertising
This manual is related to the following products: