6  Maintenance Under Voltage-Free Conditions

SMA Solar Technology AG

24

SC500-800HE20-WH-en-10

Maintenance Manual

2. If the GFDI or the soft grounding relay have been tripped 100 times due to short-circuit, replace

the components.
– Remove the cables. Mark the cables in the process. They must be connected to the same

terminals again later.

– Release the components and remove from the top-hat rail in an upwards direction.
– Insert the new components into the top-hat rail from above and press against the top-hat rail.
– Connect the cables to the terminals from which you removed them before.

3. If the GFDI has been replaced, set the current value to 5 A.
4. If the soft grounding relay has been replaced, make the following settings:

6.4.6 Checking the Screw Connections of the Power Cabling

1.

%"/(&3

Danger to life from electric shock or electric arc when touching live components.

• Disconnect the inverter (see Section 6.1).

Item

Configuration value

Upper potentiometer

0.8

Middle potentiometer

0 s

Lower potentiometer

0.9

/05*$&

Damage to screw connections from over-tightening

• Only apply the prescribed torque to tighten loose screw connections. Torque specifications

are shown in the circuit diagram of the inverter. Contact the SMA Service Line if specifications
are missing.