Page 26

NOTE: Termination cap should pass through the wall firestop

from the exterior of the building. Adjust the termination

cap to its final exterior position on the building.

WARNING: Termination cap must be positioned so that arrow

is pointing up.

Attach the termination cap with the four wood screws provided.

Before attachment of the termination, run a bead of silicone sealant

rated above 250°F on its outside edge too, so as to make a seal to

the exterior wall.
NOTE: Wood screws can and should be replaced with appropriate

fasteners for use on stucco, brick, concrete or other types

of siding.

CAUTION: If exterior walls are finished with vinyl siding (or

materials that could become discolored or warp), it is necessary

to install the vinyl siding standoff SD-950.
Vinyl siding standoff SD-950 will be installed between the vent

termination and the exterior wall. (See Figure 42) This horizontal vent

termination bolts onto the flat portion of the vinyl siding standoff, so

an air space will exist between the wall and the termination cap.

Figure 42

For installations requiring a vertical rise on the exterior of the

building, 14-inch and 36-inch tall Snorkel Terminations, as

shown in Figure 43a are available. Follow the same installation

procedures as used for standard Horizontal Terminations. If the

Snorkel Termination must be installed below grade, (i.e. basement

application), proper drainage must be provided to prevent water

from entering the Snorkel Termination. Refer to Figure 43b. Do

not attempt to enclose the Snorkel within the wall or any other

type of enclosure.

12 INCHES

MINIMUM

SNORKEL

12 INCHES

MINIMUM

ADEQUATE

DRAINAGE

SNORKEL

Figure 43a

Figure 43b

HORIZONTAL TERMINATION