Setup and programming, Overview – Precision Digital PD6830 User Manual

Page 20

Advertising
background image

PD6830 Pulse Input Rate/Totalizer Instruction

Manual

20

SETUP AND PROGRAMMING

There is no need to recalibrate the meter for frequency in
Hz when first received from the factory.

The meter is factory calibrated for Hz prior to shipment.
The calibration equipment is certified to NIST standards.

Overview

Setup and programming is done through the infrared through-glass SafeTouch

®

buttons, or using the mechanical buttons when uncovered. There are three slide
switches located on the display module. Two are used to configure the input and the
other is to lock or unlock the SafeTouch

®

Buttons.

Advertising