Precision Digital PD6830 User Manual

Page 32

Advertising
background image

PD6830 Pulse Input Rate/Totalizer Instruction

Manual

32

Calibrating the Meter (Cal)

To scale the meter without a signal source refer to
K-Factor (Factr) or Scaling the Meter (SCale) on
page 30.

The pulse input can be calibrated to display the process in engineering units by
applying the appropriate input signal and following the calibration procedure.

The use of a calibrated signal source is strongly recommended.

1. Press

the

Up arrow button to scroll to the Calibration menu (cAL) and press

Enter.

2.

The meter displays inpt1. Apply a known signal and press Enter. The
display will flash while accepting the signal.

3.

After the signal is accepted, the meter displays dspl1 Press Enter. Enter a
corresponding display value for the signal input, and press Enter to accept.

4.

The meter displays inpt2. Apply a known signal and press Enter. The
display will flash while accepting the signal.

5.

After the signal is accepted, the meter displays dspl2. Press Enter. Enter a
corresponding display value for the signal input and press Enter to accept.

6.

After completing calibration the save? display will need to be
acknowledged using the Enter key before calibration will take effect.

Advertising