Measuring on a power plant, Checking the efficiency of an insulator, Insulating material – Amprobe MEGATEST-5000 Megohmmeter User Manual
Page 22
• Press START, wait until the measuring is over and make sure the value measured is
consistent with what you requested.
• If necessary, save the measurement you performed by pressing the SAVE key (ref.
4.6.2 Measuring on a power plant
Technicians and repair engineers may use this instrument in order to check out the
efficiency of the system and its compliance with specific regulations.
• Connect the instrument between each cable to be tested and the ground.
• Pre-set configurations can be used. For example, use the up or down arrow keys to
select P25: this will set a measurement of 500 V for 1’ (minute).
• Should you intend to perform tests using other parameters, choose the appropriate
• Press START, wait until the measuring is over and make sure the value measured is
consistent with what you requested.
• If necessary, save the measurement you performed by pressing the SAVE key (ref.
4.6.3 Checking the efficiency of an insulator
MEGA EST
T
5000
Insulating
Material