When measuring insulation:

- Cut power off from the installation before preparing for the tests.
- Seal off the testing area and do not allow other people to approach it throughout

the duration of the tests.

- Seal off the installation being tested, disconnecting those branches of it which

are not involved in the test.

- When measuring a section, make sure the test leads are at least 1 “ (25 mm)

apart in order to avoid discharges or unwanted coupling.

- Isolate areas not involved, so unwanted voltages do not reach them.
- Take note of which parts could be live should there be defective insulation.
- Never exceed the maximum insulation voltage the installation was built for.
- Disconnect from the installation any equipment (transformers, bells, intercom

systems, antenna systems, pumps, timers, lights…) which might be damaged by
the measuring or might make it less reliable.


WARNING

p


Danger due to capacitance. Measuring over a very large installation or on
condensers can lead to a dangerous accumulation of power. Always wait for
the voltage to go back to zero before disconnecting the instrument.


1.2 After

use

• Once measuring has been completed, press the OFF key to turn the instrument off.

• If you expect not to use the instrument for a long period of time, take the batteries out.