Step5: supply power to the poe injector hub, 2 rack mounting – PLANET POE-1200 User Manual

Page 11

Advertising
background image

8

Connection to the PoE Injector Hub requires UTP Category 5 network cabling with RJ-45 tips. For
more information, please see the Cabling Specification in Appendix A.

Step5:

Supply power to the PoE Injector Hub.

A.

Connect one end of the power cable to the PoE Injector Hub.

B.

Connect the power plug of the power cable to a standard wall outlet.

When the PoE Injector Hub receives power, the Power LED should remain solid Green.

2.2.2 Rack Mounting

To install the PoE Injector Hub in a 19-inch standard rack, follow the instructions described below.

Step1:

Place your PoE Injector Hub on a hard flat surface, with the front panel positioned towards your front side.

Step2:

Attach a rack-mount bracket to each side of the PoE Injector Hub with supplied screws attached to the package.

Figure 2-8

shows how to attach brackets to one side of the PoE Injector Hub.

Figure 2-8

Attaching the brackets to the PoE Injector Hub

You must use the screws supplied with the mounting brackets. Damage caused to the parts by

using incorrect screws would invalidate the warranty.

Step3:

Secure the brackets tightly.

Step4:

Follow the same steps to attach the second bracket to the opposite side.

Step5:

After the brackets are attached to the Injector, use suitable screws to securely attach the brackets to the rack, as

shown in

Figure 2-9.

Advertising
This manual is related to the following products: