4 dielectric strength (hi-pot) testing, Ielectric, Trength – GE MULTILINK ML2400 User Manual

Page 62: Esting

Advertising
background image

3–10

MULTILINK ML2400 ETHERNET COMMUNICATIONS SWITCH – INSTRUCTION MANUAL

INSTALLATION

CHAPTER 3: INSTALLATION

3.4.4

Dielectric Strength (hi-pot) Testing

The shorting link between the

and safety ground must be removed prior to the

dielectric strength test to protect the transient suppression circuitry of the power supply.

FIGURE 3–4: Dielectric strength testing

Advertising