Marathon monitors inc – Marathon Computer UNIPRO V3.5 User Manual

Page 7

Advertising
background image

Marathon Monitors Inc

.

Unipro 3.5 Process Control 1 Aug. 1997

On subsequent removals and installations the rear

panel can be removed (4 screws) and the wiring

does not have to be disturbed.

Warning

All connections, rear panel installations and removals; plus

triac board installations and removals must be done with

power removed from TBA and TBB. All PC boards should

only be removed or installed with power off via the switch

mounted on the triac board. Otherwise, serious personal

and/or equipment damage can occur.

Thermocouples and Other Signal Wires

The wiring used to connect the signal wires to the instrument
should be run in a conduit, separate from any AC lines in the area.
This provides noise immunity and physical protection.
Thermocouples should be wired with the appropriate alloy
extension wire with no termination other than at the instrument. As
with all cold-junction compensating instruments, extreme care
should be used when an existing thermocouple is to be used for
both the Controller and another instrument at the same time.

Control Devices

The UNIPRO provides simple ON/OFF as well as Proportional
control through its two contact closure Control Outputs (TBA-7,
TBB-7, TBA-8, and TBB-8) and two Analog Outputs (TBD-13
through TBD-16). Refer to the Section on Control Modes for
more details on the outputs. This allows control through simple
ON/OFF devices or through Proportional control methods.

SIMPLE ON/OFF CONTROL: Set Control Mode for

ON/OFF Control. This provides contact closure at Control Output
#1 to control absolute heat application/removal for such devices as
heating elements, etc.

Advertising