For keyboard wedge interface – Metrologic Instruments MS7320 User Manual

Page 9

Advertising
background image

5

Figure 2: Keyboard Wedge Interfaces

I

NSTALLATION FOR

K

EYBOARD

W

EDGE

I

NTERFACE

1. Turn off the host system.

2. Disconnect the keyboard from the host.

3. Connect the PowerLink cable to the 10-pin

KBW interface jack. It is the 2

nd

round

opening from the left side of the MS7320

(see figure 2).

4. Connect the “Y” end of the

PowerLink cable to the keyboard
and the keyboard port on the host.
If necessary use the male/female
adapter cable supplied with the scanner for
proper connections.

Before continuing verify that the
PowerLink cable is connected to the
appropriate interface jack on the scanner.
An incorrect cable connection can cause
communication problems or potential
damage to the scanner.

5. Connect the external power supply

to the power jack on the PowerLink cable.

6. Check the AC input requirements

of the power supply to make sure
the voltage matches the AC outlet.

7. Connect AC power to the transformer.

The outlet should be near the equipment
and easily accessible.

8. Scan

the

Load Keyboard Wedge Defaults

bar code to configure the MS7320 for
Keyboard Wedge communication.

9. Turn on the host system.

10. Snap on the cable cover.



See SELV Power Source caution statement located on page 16 of this manual.

Load Keyboard

Wedge Defaults