M1 maintenance interval operations table, General information – Sterling Trucks Acterra MX User Manual

Page 22

Advertising
background image

IMPORTANT: After performing all operations listed in
this table, perform all daily, weekly, and monthly
maintenance operations listed in the "Pretrip and
Post-Trip Inspections and Maintenance" chapter of
the

Acterra

®

Driver’s Manual.

NOTE: Numbers in this table are maintenance opera-
tion reference numbers matching those in the text of
this manual.

M1 Maintenance Interval Operations

Maint.

Oper. No.

M1 Maintenance Interval Operations

00–15

Lubrication and Fluid Level Check:

Clutch Release Bearing and Release Cross-Shaft Lubricating

Hydraulic Fluid Level Checking

Manual Transmission Fluid Level Checking

Fifth Wheel Lubricating

Trailer Electrical Connector Lubricating

Suspension Lubricating

Knuckle Pin Lubricating

Tie-Rod End Lubricating

All-Wheel-Drive Front Axle Oil Level Checking

Axle Lubricant Level Checking

Driveline Lubricating

Foot Brake Valve Actuator Lubricating, Bendix E–8P

Automatic Slack Adjuster Lubricating, Meritor

Automatic Slack Adjuster Lubricating, Gunite

Automatic Slack Adjuster Lubricating, Haldex

Drag Link Lubricating

Power Steering Reservoir Fluid Level Checking

Power Steering Gear Lubricating (Ross TAS Series)

Weatherstrip, Door Latch, and Door Hinge Lubricating

31–02

Fifth Wheel Inspecting

32–01

Suspension Inspecting

33–02

Tie-Rod End Inspecting

35–02

Axle Breather Checking

41–01

Driveline Inspecting

42–01

Air Dryer Inspecting, Bendix AD–9

42–02

Air Brake Valve Inspecting and Leak Checking, Bendix BP–R1

42–04

Air Brake Valve Operation Checking

42–05

Relay Valve Checking, Midland

42–06

Quick Release and Flipper Valves Checking, Midland

42–07

Brake Chamber Inspecting (All Models)

General Information

00

M1 Maintenance Interval Operations Table: 00–10

Acterra Maintenance Manual, October 2008

00/15

Advertising