Chapter 1 quick start, 5 installation – SIGMA SQC-122c User Manual

Page 10

Advertising
background image

Chapter 1

Quick Start

1-5

1.5 Installation

W

ARNING

: Care should be exercised to route SQC-122c cables as far as practical from

other cables that carry high voltages or generate noise. This includes other line voltage
cables, wires to heaters that are SCR-controlled, and cables to source power supplies
that may conduct high transient currents during arc down conditions.

Rack
Installation

The SQC-122c occupies a 5.25” high, half-rack space. An
optional installation kit is available to adapt to a full rack (see
Chapter 4). Install the unit in a 19” rack with the supplied
hardware.

Power
Connection

The SQC-122c automatically detects mains voltages of 100-
120 and 200-240VAC, 50/60Hz.

W

ARNING

: Verify that the power cable provided is connected to

a properly grounded mains receptacle.

Sensor Input
Connections

Connect the BNC cables and oscillators from your vacuum
chamber feedthrough to the desired SQC-122c sensor inputs.

Source Output
Connections

Connect the BNC cables from the SQC-122c output
connectors to your evaporation supply control input.

Digital I/O
Connections

Refer to Appendix C for details on wiring digital I/O to the SQC-
122c Relay I/O connectors.

Computer
Connection

If you would like to use the Windows software to collect data or
program the SQC-122c, attach a 9 pin straight-thru cable from
the RS-232 connector to your computer’s serial port.

Advertising