Chapter 2 operation – SIGMA SQC-122c User Manual

Page 30

Advertising
background image

Chapter 2

Operation

2-16

about 10% overshoot, lower the P Term. If the time to reach PWR

DR

is very slow,

increase the P Term. A lower I Term will increase response time, a higher value will
eliminate ringing and setpoint deviations. It is unlikely you will need any D Term.

Continue to Start the process and adjust PID until steady-state response is smooth and
the step response is reasonably controlled. You don’t need to totally eliminate ringing
during the step if the steady-state response is smooth, preconditioning will minimize
step changes.

Set Preconditioning: The power level you recorded as PWR

0R

is the power where

deposition just begins. That’s a good value for Ramp 1 power. PWR

DR

, or slightly less,

is a good value for Ramp 2 Power. This will eliminate a large step change when
entering the deposition phase.

Once PID terms are established for a material, they will typically be similar for other
materials. Only the P Term and preconditioning power levels may need adjustment.

Advertising